loading
News
Stay informed with the latest updates from GLEN, including project achievements, product developments, factory tests, technical collaborations, and industry insights.
GLEN Engineering | Beyond Equipment. Engineered Solutions.

Reliable mooring and berthing operations start with strong engineering capabilities.
GLEN Engineering | Engineered for Safety. Built for Reliability.

At GLEN Engineering, welding quality is more than a manufacturing requirement — it's the foundation of reliable mooring and berthing equipment.
Strengthening GLEN's Quality Expertise with AMPP Certification

We are pleased to share that a member of the GLEN Engineering team has achieved the AMPP Certified Coatings Inspector Certification, further strengthening our professional capability in surface preparation, coating inspection and corrosion protection quality control.
GLEN 250T FSO Hooks Ready for Delivery
Just one week after successfully passing Factory Acceptance Testing (FAT) witnessed by the client and DNV, our ๐ญ๐ฐ๐จ ๐Ÿ๐Ÿ“๐ŸŽ๐“ ๐…๐’๐Ž ๐๐ฎ๐ข๐œ๐ค ๐‘๐ž๐ฅ๐ž๐š๐ฌ๐ž ๐‡๐จ๐จ๐ค๐ฌ have now completed the final production stages and are on the way to the project site.
250T FSO QRHs โ€” FAT Successfully Completed with DNV Witness
This week, our client representatives and DNV attended the Factory Acceptance Test (FAT) for two 250T FSO Quick Release Hooks (QRHs) at Glen Engineering's facility.
From Design to Commissioning โ€” Built In-House by Glen Engineering

From initial concept to final commissioning, Glen Engineering team independently delivers the complete BAS solution in-house.
From Factory to Port: The Safe Loading Journey of 49 Sets of Cone Fender Front Panels
Recently, GLEN completed the container loading process for 49 sets of Cone Fender front panels, prepfaring them for shipment to our customer.
Behind Every Reliable Mooring System: GLEN's Commitment to Welding Excellence
To further strengthen our welding capability, GLEN is conducting a comprehensive Welding Procedure Qualification (WPS) program in accordance with DNV requirements.
Pre-ABS Witness Load Test of GLEN's 250T Hawser Hook
At Glen Engineering, quality is never assumed — it is verified.Before the official ABS witness inspection, our 250T Hawser Hook successfully completed the internal proof load test to validate its structural integrity, load-bearing capacity, and operational reliability under extreme loading conditions.Every stage of the testing process is carried out with strict quality control:โœ”๏ธ Pre-load test inspectionโœ”๏ธ Ready for load testingโœ”๏ธ Proof load test executionโœ”๏ธ Post-load test inspectionโœ”๏ธ Equipment condition verificationFor us, testing is more than a certification requirement — it's our commitment to delivering equipment that performs safely and reliably in the most demanding marine environments.
Partner Visit & Technical Training at GLEN Engineering
๐Ÿค We were delighted to host our partner at the Glen Engineering facility for a comprehensive factory visit and technical training session.
Client-Witnessed FAT Completed to Ensure Reliable Capstan Performance
We were pleased to welcome our client representatives to Glen's manufacturing facility for the ๐…๐š๐œ๐ญ๐จ๐ซ๐ฒ ๐€๐œ๐œ๐ž๐ฉ๐ญ๐š๐ง๐œ๐ž ๐“๐ž๐ฌ๐ญ (๐…๐€๐“) ๐จ๐Ÿ ๐Ÿ๐จ๐ฎ๐ซ ๐…๐ซ๐ž๐ž-๐’๐ญ๐š๐ง๐๐ข๐ง๐  ๐‚๐š๐ฉ๐ฌ๐ญ๐š๐ง๐ฌ.
0.5-Second Emergency Release Capability of GLEN's QRH
In critical mooring situations, every fraction of a second matters. Glen Quick Release Hooks are engineered to achieve emergency release within 0.5 seconds, enabling rapid disconnection of mooring lines under full design load.
Product Lives
Customer service