loading
News
Stay informed with the latest updates from GLEN, including project achievements, product developments, factory tests, technical collaborations, and industry insights.
GLEN 250T FSO Hooks Ready for Delivery
Just one week after successfully passing Factory Acceptance Testing (FAT) witnessed by the client and DNV, our 𝐭𝐰𝐨 𝟐𝟓𝟎𝐓 𝐅𝐒𝐎 𝐐𝐮𝐢𝐜𝐤 𝐑𝐞𝐥𝐞𝐚𝐬𝐞 𝐇𝐨𝐨𝐤𝐬 have now completed the final production stages and are on the way to the project site.
250T FSO QRHs — FAT Successfully Completed with DNV Witness
This week, our client representatives and DNV attended the Factory Acceptance Test (FAT) for two 250T FSO Quick Release Hooks (QRHs) at Glen Engineering's facility.
From Design to Commissioning — Built In-House by Glen Engineering

From initial concept to final commissioning, Glen Engineering team independently delivers the complete BAS solution in-house.
From Factory to Port: The Safe Loading Journey of 49 Sets of Cone Fender Front Panels
Recently, GLEN completed the container loading process for 49 sets of Cone Fender front panels, prepfaring them for shipment to our customer.
Behind Every Reliable Mooring System: GLEN's Commitment to Welding Excellence
To further strengthen our welding capability, GLEN is conducting a comprehensive Welding Procedure Qualification (WPS) program in accordance with DNV requirements.
Pre-ABS Witness Load Test of GLEN's 250T Hawser Hook
At Glen Engineering, quality is never assumed — it is verified.Before the official ABS witness inspection, our 250T Hawser Hook successfully completed the internal proof load test to validate its structural integrity, load-bearing capacity, and operational reliability under extreme loading conditions.Every stage of the testing process is carried out with strict quality control:✔️ Pre-load test inspection✔️ Ready for load testing✔️ Proof load test execution✔️ Post-load test inspection✔️ Equipment condition verificationFor us, testing is more than a certification requirement — it's our commitment to delivering equipment that performs safely and reliably in the most demanding marine environments.
Partner Visit & Technical Training at GLEN Engineering
🤝 We were delighted to host our partner at the Glen Engineering facility for a comprehensive factory visit and technical training session.
Client-Witnessed FAT Completed to Ensure Reliable Capstan Performance
We were pleased to welcome our client representatives to Glen's manufacturing facility for the 𝐅𝐚𝐜𝐭𝐨𝐫𝐲 𝐀𝐜𝐜𝐞𝐩𝐭𝐚𝐧𝐜𝐞 𝐓𝐞𝐬𝐭 (𝐅𝐀𝐓) 𝐨𝐟 𝐟𝐨𝐮𝐫 𝐅𝐫𝐞𝐞-𝐒𝐭𝐚𝐧𝐝𝐢𝐧𝐠 𝐂𝐚𝐩𝐬𝐭𝐚𝐧𝐬.
0.5-Second Emergency Release Capability of GLEN's QRH
In critical mooring situations, every fraction of a second matters. Glen Quick Release Hooks are engineered to achieve emergency release within 0.5 seconds, enabling rapid disconnection of mooring lines under full design load.
GLEN BAS Berthing & Unberthing Simulation
Glen's Berthing Aid System (BAS) goes beyond real-time monitoring —bringing precision to both berthing and unberthing through advanced simulation capabilities.
GLEN Cone Fender System Manufacturing & Testing Process
At GLEN Engineering, every Cone Fender System undergoes a comprehensive manufacturing, inspection, and testing process before delivery.
Customer service
detect