T-head 100Ton Bollard Installing at Site

T-head 100Ton Bollard Installing at Site 1

After 60 days of hard work, 72 sets of T-head bollards have been inspected and delivered overseas. Bollard design, drawing review, casting, grinding, sandblasting, painting, and packing, all went very smoothly. After another 60 days, bollards arrived at the project site and were installed. Thank the customer for providing site photos, the bollard also started his service career. For more bollard selection and design, please contact GLEN.

 

T-head 100Ton Bollard Installing at Site 2
T-head 100Ton Bollard Installing at Site 3
T-head 100Ton Bollard Installing at Site 4