What should an EPC or consultant include in a QRH RFQ to avoid repeated technical clarifications and integration delays?

2026-09-15

A complete Request for Quotation (RFQ) should define the required Safe Working Load (SWL), number of hooks, capstan requirements, vessel and mooring data, line angles, hazardous-area classification, remote release philosophy, reset requirements, load monitoring, PLC and control architecture, communication interfaces, foundation constraints, environmental conditions, certification requirements, proof-load and functional testing, documentation, spare parts, commissioning and Site Acceptance Test (SAT) expectations.

For LNG or FSRU projects, the RFQ should also identify Ship-Shore Link (SSL), Emergency Shutdown (ESD) and emergency mooring release interfaces.

Where the project requires remote release, load monitoring or centralized monitoring in addition to QRH, the RFQ should also define the relevant interface and control requirements. These may include communication methods, alarm requirements and data-integration scope for CMS, MLMS and EMS. During FEED, GLEN can support equipment selection and design, 3D installation-fit verification and static mooring analysis. Its QRH are available in single-hook and multi-hook configurations and can be combined with a remote release control system.

Defining these requirements at the RFQ stage helps suppliers respond to a consistent technical scope and supports subsequent system integration and testing.

What should an EPC or consultant include in a QRH RFQ to avoid repeated technical clarifications and integration delays? 1

Can existing QRH be upgraded with load monitoring and connected to an older terminal DCS?
next
Related questions
GET IN TOUCH WITH Us
Customer service
detect