loading

Can GLEN replace an existing QRH without rebuilding the original foundation?

2026-08-27

In some retrofit projects, an existing Quick Release Mooring Hook can be replaced without rebuilding the original foundation, subject to engineering verification. The review should consider the existing bolt layout, concrete foundation, load path, available installation space and original design capacity.

Where the foundation remains suitable, a customized base plate, adapter arrangement or revised anchoring solution may enable a new QRH to match the existing civil interface. This can reduce demolition work, berth downtime and installation costs. The final retrofit solution normally requires a site survey, original design drawings and operating-load information.

GLEN provides replacement services and technical support during installation, commissioning, operation and maintenance. This may include equipment-positioning guidance, preparation or update of IOM manuals, operator training, maintenance support, and technical and project support for retrofit work. Depending on the maintenance scope, inspections and functional testing may also be carried out before the equipment returns to service.

 Can GLEN replace an existing QRH without rebuilding the original foundation? 1

prev
Can existing mechanical QRH be retained while the PLC, control system or load monitoring is upgraded?
What foundation and interface information does a civil designer need before finalizing the QRH layout?
next
Related questions
GET IN TOUCH WITH Us
Customer service
detect